JANAÚBA PVP – PHASE II
EPC construction of the Janaúba Photovoltaic Power Plant – Phase II. Work performed by the Construction Consortium.Entrepreneur: Elera Renováveis.Location: Janaúba (MG).
UHE ITAIPU
Developer: Itaipu Binacional Services Performed: Detailed design of the spillway and side dam between the powerhouse and the spillway. Inspection and diligence, technical support and monitoring of manufacturing of materials and permanent equipment of the plant. Technical specifications for the Basic Design of the manufacture…
UHE BELO MONTE
Developer: Consórcio Norte Energia S.A. Services Performed: Preparation of the Civil Detailed DesignDetailed Design and Electromechanical Assembly. Location: Xingu river, Pará
UHE TUCURUÍ
Services Performed: Basic and Detailed Design, quality control of concrete, soil and filling works, electromechanical assemblies, inspection and commissioning of equipment, and environmental studies of the venture. Developer: EletronorteLocation: Paraná river, between Foz do Iguaçu, in Brazil, and Ciudad del Este, in Paraguay
LT 500 kV NEW FIELDS
Services Performed: EPC contract for the interconnection of Campos Novos Substation with Biguaçu and Blumenau Substations Engevix Engenharia and Schahin Engenharia Consortium, under a global price EPC regime. Including design, supervision, management, supply, construction and assembly, consisting of a 525 kV transmission line. Developer:SC ENERGIA…
LT 500 kV BARREIRAS II – RIO DAS ÉGUAS
Services Performed: Complete EPC contract of transmission lines comprising design, supervision, management, procurement and construction. Developer:PARANAÍBA ENERGY TRANSMITTER S / A Length: 239.3 Km
EOLICA BARRA DOS COQUEIROS
Developer: Desenvix Services Performed: Management, supervision and coordination of the implementation of Barra dos Coqueiros Wind Complex in EPCm mode – 34.5MW. In addition to Detailed Design contract and implementation of all civil works and transmission systems.Location: Barra dos Coqueiros – SE
BAHIA WIND COMPLEX
Services Performed: Implementation of Bahia Wind Complex consisting of Seabra, Novo Horizonte and Macaúbas parks – 95MW. With more than 4 years of operation, the Complex is a reference in energy production, standing out among the best wind generation performances in the country. Capacity factor…
UHE MONJOLINHO
Developer: MONEL Monjolinho Energética S.A. Services Performed: Feasibility study, environmental studies, Basic Design, complete Detailed DesignDetailed Design and support to civil works and electromechanical assembly, as well as quality control, works in the reservoir and emergency action plan. Location: Passo Fundo river, between the municipalities…
UHE CASTRO ALVES
Developer: CERAN – Companhia Energética Rio das Antas Services Performed: Feasibility Study; Basic Design; Complete Detailed DesignDetailed Design; Provisions of Mechanical Auxiliary Systems; Technical Support to Civil Works and Commissioning. Location: Antas river, between the municipalities of Nova Pádua and Nova Roma do Sul –…