Developer: MONEL Monjolinho Energética S.A.

Services Performed: Feasibility study, environmental studies, Basic Design, complete Detailed DesignDetailed Design and support to civil works and electromechanical assembly, as well as quality control, works in the reservoir and emergency action plan.

Location: Passo Fundo river, between the municipalities of Nonoai and Faxinalzinho/RS.