TIME LINE

1965
- Establishment of ENGEVIX S.A. (Estudos e Projetos de Engenharia).

YEARS 70
- Development of large projects of hydroelectric plants.
- Expansion of offices.
- First international experience: Palmar Hydroelectric Plant in Uruguay

YEARS 80
- Technological implementation with CAD (Computer Aided Design).
- Management of 64 expansion projects of COSIPA.

YEARS 90
- Obtained certification in NBR ISO 9001 Standard.
- Success in the first experiences in full contracting (EPC), increasing the contracts of this modality.

YEARS 2000
- Obtained NBR ISO 14001 and OHSAS 18001 certifications.
- First Consultative Engineering company in Brazil with triple certification.

2007
- Opening of ENGEVIX Group’s first two own projects: the small hydroelectric plants Esmeralda (RS), with 22 MW, and Santa Laura (SC), with 15 MW.

2013
- Creation of ENGEVIX Construções, Engenharia e Montagem.
- Offshore activities involving oil and gas, shipbuilding, wind farms, airport and highway concessions.

2016
- Construction of 303 km of Transmission Line (500 kV) with the highest power transmitted in Brazil (1670MW).
- Company restructuring and start of Nova Engevix.

2017
- Continued implementation of rigorous integrity processes – Compliance.

2018
- Recertification of ISO 9001 and ISO 14001 standards and migration of both standards to revised 2015 version.
- First company in Brazil to achieve ISO 45001:2018 certification, from Fundação Vanzolini.