<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Infrastructure &#8211; Nova Participações</title>
	<atom:link href="https://www.novaparticipacoes.com/en/category/infrastructure/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.novaparticipacoes.com</link>
	<description>Companhia controladora da Nova Engevix Engenharia e Projetos S.A. e Nova Engevix Construções e Montagens S.A.</description>
	<lastBuildDate>Fri, 09 Sep 2022 21:57:43 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.2.20</generator>

<image>
	<url>https://www.novaparticipacoes.com/wp-content/uploads/2019/07/cropped-nova-favicon-512-32x32.png</url>
	<title>Infrastructure &#8211; Nova Participações</title>
	<link>https://www.novaparticipacoes.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>PORTAL DO PRÍNCIPE ROAD COMPLEX</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/portal-do-principe-road-complex/</link>
				<pubDate>Thu, 08 Sep 2022 21:54:27 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=13061</guid>
				<description><![CDATA[<p>Execution of road readjustments with paving, drainage, traffic light system, bike path, public lighting and community parks in Portal do Príncipe.Entrepreneur: Secretary of State for Mobility and Infrastructure (SEMOBI).Location: Vitória (ES).</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/portal-do-principe-road-complex/">PORTAL DO PRÍNCIPE ROAD COMPLEX</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p>Execution of road readjustments with paving, drainage, traffic light system, bike path, public lighting and community parks in Portal do Príncipe.<br>Entrepreneur: Secretary of State for Mobility and Infrastructure (SEMOBI).<br><strong>Location:</strong> Vitória (ES).</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/portal-do-principe-road-complex/">PORTAL DO PRÍNCIPE ROAD COMPLEX</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
										</item>
		<item>
		<title>BRASÍLIA INTERNATIONAL AIRPORT</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/brasilia-international-airport/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/brasilia-international-airport/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:47:53 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Airports]]></category>
		<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3181</guid>
				<description><![CDATA[<p>Developer: Inframérica Services Performed: Expansion of North and South Piers with 16 new boarding bridges, parking for 1,800 vehicles, duplication of the access viaduct to boarding level, expansion of the aircraft yard, taxiways, roadways and new 1,500m² VIP room. Full reform of terminals 1 and...</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/brasilia-international-airport/">BRASÍLIA INTERNATIONAL AIRPORT</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Developer: </strong>Inframérica </p>



<p><strong>Services Performed: </strong>Expansion of North and South Piers
with 16 new boarding bridges, parking for 1,800 vehicles, duplication of the
access viaduct to boarding level, expansion of the aircraft yard, taxiways,
roadways and new 1,500m² VIP room. Full reform of terminals 1 and 2, two new
piers and 250,000 m² of flexible and rigid pavements. Airport capacity expanded
to up to 30 million passengers/year.</p>



<p>Services performed within the world record
deadline of 15 months by Helvix Consortium, in which Engevix participated with
50%, being ahead of the civil works.</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/brasilia-international-airport/">BRASÍLIA INTERNATIONAL AIRPORT</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/brasilia-international-airport/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>EDUARDO GOMES INTERNATIONAL AIRPORT</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/eduardo-gomes-international-airport/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/eduardo-gomes-international-airport/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:37:59 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Airports]]></category>
		<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3173</guid>
				<description><![CDATA[<p>Developer: Infraero Services Performed: Execution of engineering works/services for reform, adequacy and expansion of the Passenger Terminal I at Eduardo Gomes International Airport &#8211; Manaus/AM. Current airport capacity of 18 million passengers per year.</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/eduardo-gomes-international-airport/">EDUARDO GOMES INTERNATIONAL AIRPORT</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Developer: </strong>Infraero</p>



<p><strong>Services Performed:</strong> Execution of engineering works/services for reform, adequacy and expansion of the Passenger Terminal I at Eduardo Gomes International Airport &#8211; Manaus/AM. Current airport capacity of 18 million passengers per year. </p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/eduardo-gomes-international-airport/">EDUARDO GOMES INTERNATIONAL AIRPORT</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/eduardo-gomes-international-airport/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>SÃO GONÇALO DO AMARANTE AIRPORT</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/sao-goncalo-do-amarante-airport/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/sao-goncalo-do-amarante-airport/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:36:34 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Airports]]></category>
		<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3167</guid>
				<description><![CDATA[<p>Developer: Inframérica Services Performed: Project and execution of the passenger terminal, cargo terminal, control tower and the peripheral structures of Natal airport. Turnkey contract, including project and execution, as well as management and provision of materials, equipment and labor. Capacity up to 8 million passengers/year.</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/sao-goncalo-do-amarante-airport/">SÃO GONÇALO DO AMARANTE AIRPORT</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Developer: </strong>Inframérica </p>



<p><strong>Services Performed:</strong> Project and execution of the passenger
terminal, cargo terminal, control tower and the peripheral structures of Natal
airport. Turnkey contract, including project and execution, as well as
management and provision of materials, equipment and labor.

Capacity up to 8 million passengers/year.



</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/sao-goncalo-do-amarante-airport/">SÃO GONÇALO DO AMARANTE AIRPORT</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/sao-goncalo-do-amarante-airport/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>FLORIANOPOLIS SEWER TREATMENT SYSTEM – SC</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/florianopolis-sewer-treatment-system-sc/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/florianopolis-sewer-treatment-system-sc/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:20:40 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Infrastructure]]></category>
		<category><![CDATA[Sanitation]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3144</guid>
				<description><![CDATA[<p>Developer: CASAN – Companhia Catarinense de Águas e Saneamento &#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160; &#160;&#160;&#160;&#160;&#160;&#160; CCOS – Consórcio Catarinense de Obras e Saneamento Services Performed: Detailed Design/Management/Surveillance/Technical Support to the Work Beneficiaries: &#160;&#160; 1st stage &#8211; 150,000 inhabitants 2nd &#8211; 225,000 inhabitants Sewerage systems in the municipality of Florianópolis,...</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/florianopolis-sewer-treatment-system-sc/">FLORIANOPOLIS SEWER TREATMENT SYSTEM – SC</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Developer:</strong> CASAN – Companhia Catarinense de Águas e Saneamento</p>



<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CCOS – Consórcio Catarinense de Obras e Saneamento</p>



<p><strong>Services Performed:</strong> Detailed Design/Management/Surveillance/Technical
Support to the Work</p>



<p><strong>Beneficiaries: &nbsp;&nbsp;</strong> </p>



<p>1<sup>st</sup> stage &#8211; 150,000 inhabitants</p>



<p>2<sup>nd</sup> &#8211; 225,000 inhabitants</p>



<p>Sewerage systems in the municipality of
Florianópolis, Santa Catarina island, covering the watersheds A, B, C, D, E, A1
and F. </p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/florianopolis-sewer-treatment-system-sc/">FLORIANOPOLIS SEWER TREATMENT SYSTEM – SC</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/florianopolis-sewer-treatment-system-sc/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>Metrô de Salvador/BA.</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/metro-de-salvador-ba-2/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/metro-de-salvador-ba-2/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:17:40 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3143</guid>
				<description><![CDATA[<p>Services Performed: Supervision of civil works, fixed system, support to environmental management and eminent domain for implementation of Metrô de Salvador/BA. Client: CTB – Companhia de Transportes do Estado da Bahia Consortium: Engevix (60%) and UFC (40%)</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/metro-de-salvador-ba-2/">Metrô de Salvador/BA.</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Services Performed:</strong> Supervision of civil works,
fixed system, support to environmental management and eminent domain for
implementation of Metrô de Salvador/BA.</p>



<p><strong>Client: </strong>CTB – Companhia de
Transportes do Estado da Bahia</p>



<p>Consortium:
Engevix (60%) and UFC (40%)</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/metro-de-salvador-ba-2/">Metrô de Salvador/BA.</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/metro-de-salvador-ba-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>Monorail System of Line 17</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/monorail-system-of-line-17/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/monorail-system-of-line-17/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:17:01 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3142</guid>
				<description><![CDATA[<p>Services Performed: Detailed Designs of Civil Engineering, Finishing, Visual Communication and Landscaping of the Stations and Água Espraiada Yard and Technical Monitoring of the Works in the Monorail System of Line 17 – Gold. Length: 17.9 km of elevated ways 18 stations 01 maintenance yard...</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/monorail-system-of-line-17/">Monorail System of Line 17</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Services Performed:</strong> Detailed Designs of Civil Engineering,
Finishing, Visual Communication and Landscaping of the Stations and Água
Espraiada Yard and Technical Monitoring of the Works in the Monorail System of
Line 17 – Gold.</p>



<p><strong>Length: </strong></p>



<p>17.9 km of elevated ways </p>



<p>18 stations </p>



<p>01 maintenance yard </p>



<p><strong>Fleet comprising 24 trains</strong></p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/monorail-system-of-line-17/">Monorail System of Line 17</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/monorail-system-of-line-17/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>GUARUJÁ SUBMERSE TUNNEL</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/guaruja-submerse-tunnel/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/guaruja-submerse-tunnel/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:16:23 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3141</guid>
				<description><![CDATA[<p>Services Performed: Preparation of EIA-RIMA and Environmental Licensing for Consolidation and Optimization of the Selected Engineering Project Alternative to Prepare the Elements for Bidding of Executive Detailing Works of Santos-Guarujá Road Connection. Length: approximately 900.00 m long x 10.00 m high Developer: DERSAStart: Jun/12&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160;&#160; End:...</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/guaruja-submerse-tunnel/">GUARUJÁ SUBMERSE TUNNEL</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Services Performed:</strong> Preparation of EIA-RIMA and Environmental
Licensing for Consolidation and Optimization of the Selected Engineering
Project Alternative to Prepare the Elements for Bidding of Executive Detailing
Works of Santos-Guarujá Road Connection. </p>



<p><strong>Length:</strong> approximately 900.00 m long x 10.00 m high</p>



<p><strong>Developer: </strong>DERSA<strong>Start: </strong>Jun/12&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
<strong>End: </strong>Dec/13



</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/guaruja-submerse-tunnel/">GUARUJÁ SUBMERSE TUNNEL</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/guaruja-submerse-tunnel/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>Viaduct (RITA MARIA)</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/viaduct-rita-maria/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/viaduct-rita-maria/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:15:04 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3136</guid>
				<description><![CDATA[<p>Services Performed: Technical Consultancy for Basic Design, Detailed Design, Coordination, Supervision and Subsidies for Surveillance of Construction Works of the Viaduct (Av. Paulo Fontes), including road improvements with earthworks, asphalt paving, drainage, current works of art, signage, lighting, containment works and complementary works at the...</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/viaduct-rita-maria/">Viaduct (RITA MARIA)</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Services Performed:</strong> Technical Consultancy for Basic Design, Detailed Design, Coordination, Supervision and Subsidies for Surveillance of Construction Works of the Viaduct (Av. Paulo Fontes), including road improvements with earthworks, asphalt paving, drainage, current works of art, signage, lighting, containment works and complementary works at the intersection of Avenida Paulo Fontes and Rua Antônio Pereira de Oliveira Neto.</p>



<p><strong>Client: </strong>FLORIANÓPOLIS CITY COUNCIL<strong>Start: </strong>12/10&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
<strong>End: </strong>Jul/12



</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/viaduct-rita-maria/">Viaduct (RITA MARIA)</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/viaduct-rita-maria/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>Anita Garibaldi Cable-Stayed Bridge</title>
		<link>https://www.novaparticipacoes.com/en/infrastructure/anita-garibaldi-cable-stayed-bridge/</link>
				<comments>https://www.novaparticipacoes.com/en/infrastructure/anita-garibaldi-cable-stayed-bridge/#respond</comments>
				<pubDate>Thu, 17 Oct 2019 19:13:59 +0000</pubDate>
		<dc:creator><![CDATA[Nova Participações]]></dc:creator>
				<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.novaparticipacoes.com/?p=3135</guid>
				<description><![CDATA[<p>Services Performed: Detailed Design and Supervision of the Construction Works of Anita Garibaldi Cable-Stayed Bridge over Laranjeiras Channel at BR-101/SC. Developer: DNIT Start: Dec/12&#160;&#160;&#160;&#160; &#160;&#160;&#160;&#160;&#160;&#160;&#160; End: Dec/15</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/anita-garibaldi-cable-stayed-bridge/">Anita Garibaldi Cable-Stayed Bridge</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></description>
								<content:encoded><![CDATA[
<p><strong>Services Performed:</strong> Detailed Design and Supervision of the
Construction Works of Anita Garibaldi Cable-Stayed Bridge over Laranjeiras
Channel at BR-101/SC.</p>



<p><strong>Developer: </strong>DNIT</p>



<p>Start: Dec/12&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>



<p>End: Dec/15</p>
<p>O post <a rel="nofollow" href="https://www.novaparticipacoes.com/en/infrastructure/anita-garibaldi-cable-stayed-bridge/">Anita Garibaldi Cable-Stayed Bridge</a> apareceu primeiro em <a rel="nofollow" href="https://www.novaparticipacoes.com/en/pagina-inicial-en">Nova Participações</a>.</p>
]]></content:encoded>
							<wfw:commentRss>https://www.novaparticipacoes.com/en/infrastructure/anita-garibaldi-cable-stayed-bridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
	</channel>
</rss>
