TIME LINE
1965
- Establishment of ENGEVIX S.A. (Estudos e Projetos de Engenharia).
YEARS 70
- Development of large projects of hydroelectric plants.
- Expansion of offices.
- First international experience: Palmar Hydroelectric Plant in Uruguay
YEARS 80
- Technological implementation with CAD (Computer Aided Design).
- Management of 64 expansion projects of COSIPA.
YEARS 90
- Obtained certification in NBR ISO 9001 Standard.
- Success in the first experiences in full contracting (EPC), increasing the contracts of this modality.
YEARS 2000
- Obtained NBR ISO 14001 and OHSAS 18001 certifications.
- First Consultative Engineering company in Brazil with triple certification.
2007
- Opening of ENGEVIX Group’s first two own projects: the small hydroelectric plants Esmeralda (RS), with 22 MW, and Santa Laura (SC), with 15 MW.
2013
- Creation of ENGEVIX Construções, Engenharia e Montagem.
- Offshore activities involving oil and gas, shipbuilding, wind farms, airport and highway concessions.
2016
- Construction of 303 km of Transmission Line (500 kV) with the highest power transmitted in Brazil (1670MW).
- Company restructuring and start of Nova Engevix.
2017
- Continued implementation of rigorous integrity processes – Compliance.
2018
- Recertification of ISO 9001 and ISO 14001 standards and migration of both standards to revised 2015 version.
- First company in Brazil to achieve ISO 45001:2018 certification, from Fundação Vanzolini.
2019
- Signing of the Leniency Agreement – 11/12/2019.
- Adjustments to the brands and visual identity of the group's companies.
- Restructuring to resume works at the São Roque HPP (141.9 MW).
2020
- Nova Engevix Engenharia resumes negotiations with Petrobras.
- Reopening of the branch in Curitiba (PR).
- New contracts in the areas of infrastructure and transmission systems.
- Resumption of construction of HPP São Roque.
2021
- Certification in ISO 37001:2016 – Anti-Bribery Management System.
- Recertification in ISO 9001, ISO 14001 and ISO 45001.
- New contracts in the segments of transmission lines and thermoelectric plants.
- Construction of the UTEs Baliza and São Joaquim, powered by palm oil.
- Milestone in electromechanical assembly: São Roque promotes descent of the 1st rotor.
- Delivery of the Portal do Príncipe Road Complex, in Vitória (ES).
2022
- Nova Participações mantém certificação na ISO 37001 – Antissuborno
- Entrada no mercado de energia solar: construção da UFV Janaúba - Fase II
- Conclusão e entrada em operação comercial da UHE São Roque
- Contrato para atualização tecnológica da UHE Itaipu