UTE NORTE FLUMINENSE – 780 MW
Power Generation UTEs
Services Performed: Owner engineering and special consulting in substation projects, interconnection to basic grid substation, and civil engineering and elaboration of technical specifications – Macaé, Rio de Janeiro.
Characteristics: Combined cycle gas turbines
Client: EDF – Norte Fluminense.
Share