Anita Garibaldi Cable-Stayed Bridge
Infrastructure
Services Performed: Detailed Design and Supervision of the Construction Works of Anita Garibaldi Cable-Stayed Bridge over Laranjeiras Channel at BR-101/SC.
Developer: DNIT
Start: Dec/12
End: Dec/15
Share